Showing posts with label On the needles. Show all posts
Showing posts with label On the needles. Show all posts

Thursday, 29 September 2016

On the needles: EVERYTHING!

 

And by that I mean both knitting needles AND the sewing machine AND possible hand sewing of a hem...



Currently I am knitting a little baby cardigan out of handspun wool, using a pattern from What to Knit When You're Expecting (I bought it while expecting Jimmy), but it's proving to be a bit of a challenge because the amount of yarn was unknown and the weight of the yarn varies not just with a ball but between the different balls (of the same colour). The amount of yarn that is relatively close in thickness was (and still is) unknown and I've had to redo the sleeves and am working my way to the collar but am not sure how it's all going to end. I may have to undo some of the yoke and use a slightly thicker ball of yarn to finish the cardigan off. And no, it's not for any baby #2, it's for a cousin and his wife who have recently become parents to a little girl.



Then there's a quilt for Jimmy. As the seasons change from winter to spring proper and the night are no longer cold enough for heavy doonas but still cool enough for a wool blanket or two and a light quilt, I have realised that Jimmy needs a such a quilt. It was always on the cards - before having him, we bought fabric that we intended to use in a quilt and that's just what I'm doing.



I'm using a combination of leftovers from clothes we've made for ourselves, quilting flats bought at various times, and fabric bought with Jimmy in mind. I've been cutting and sewing and cutting some more, and after sewing some more fabric together (not shown), I've decided I need a little more fabric before I can sew all the pieces together. And yes, I'm using my Mum's sewing machine - I cannot hand sew quickly enough to race the coming summer and nights when sheets are not really needed.

The hand sewing is sitting on the sidelines, waiting for me to have the time and energy to address it, because hems and mending merino wool tops requires more of both than I can manage right now, between applying for jobs and the cardigan and the quilt.

Friday, 23 October 2015

On the needles: a beanie...


Way back before Jimmy was even born, back when he was inside my belly, and my belly was huge, Michael and I went to the 2013 Peace Festival and I bought this beautiful skein of alpaca from a local spinner. My plan was to make something for our baby with it, only I was going to wait until the baby was born before I did anything - the soft, soft yarn required something special, something that would suit our baby.

It was still untouched back in April, 2014, so it should come as no surprise that the wool made its way across the Pacific Ocean with us (did I mention that I brought wool over here, so that I could work my way through it and be less tempted to buy (even more) wool?).


After lots of umming and ahing, and realising that I hadn't started on any knitted project for Jimmy's 2nd birthday, I wound the skein into a ball and turned the very, very soft alpaca into a beanie.

I may have made the pattern up as I went along...

I did start with a measurement of Jimmy's head, and I did work out how many stitches of 3x3 rib went into 10 cm (or was it an inch or 5? Meh...), so I wasn't flying completely by the seat of my pants... And I kept notes, so that if I ever want to make another one, I have something to work from.

The process was fun and the project small enough to work on in the heat of July and August (I'm a slow knitter, so what). And every time I picked up my needles to work on the beanie I thought of Jimmy, and how the beanie would keep his head warm when his other beanies were not quite big enough or too cozy. I also thought of an old friend and school teacher and I remembered our brief conversation that day at the Peace Festival, and how he was ill and I was reluctant to get too close but still had trouble hearing the few words he said because his throat was so sore due to a recent bout of laryngitis - he would have appreciated the problem solving involved in the making of this beanie...


And now the beanie is finished, and after a very brief evening when the beanie was needed, Jimmy refuses to wear it. I think the fluffy alpaca is a little too warm for the mild autumn fall we're having in Kansas. Ah well! It fits, it stretches, and I know there isn't a photo of it, but the beanie comes to a point and is tied in a knot, because I wasn't wasting any yarn, so it's something of a gumnut beanie. Too bad the reference is lost on Jimmy. Perhaps we should tell him it's an acorn, then he might wear it.

Wednesday, 26 August 2015

On the needles: a little pillow...


Jimmy needed a little pillow for naptime at daycare, so after finding out that 10x8 inches was about the size that would fit their beds, I arranged to borrow our neighbours sewing machine and set to work. I may have already talked about it, but I wanted to share some more details about it (and I now regret not taking more "in progress" photos).


I wanted the pillow to be special. I used some red bunting fabric that I had bought a while back, and had already turned most of it into a pillowcase for a regular sized pillow - for Jimmy, of course. So, using the leftover fabric made perfect sense. Only there wasn't enough of it. Enter an old white cotton shirt.

I bought this shirt when I was in highschool, at a local opshop and probably paid less than $3 for it. It is 100% cotton and the cotton is lovely. The shirt is so old... I've had to cut the collar off, replaced one button and repaired the shirt area around another, and just had to deal with a work-related stain that slowly faded. And then I work it in the pool and it ended up with awful discolouration and that was that.


But I just couldn't throw it away. No chance. The fabric was still in good condition (except around the cuffs, oh well), so I was hoping that I would be able to put it to good use before we left Manhattan, KS, otherwise it would be binned (sad face). It was still hanging in the wardrobe after its replacement arrived. The fabric of the replacement is no match, in terms of quality, but the cut is about the same... anyway... I used the fabric for the pillow and the pillowcase and, to me, it makes Jimmy's naptime pillow all the more special.



I'm so happy with the end result. So is Jimmy, although he is too young to appreciate the two pockets on the same side as the opening, but he will. He saw me making parts of it, most of it even, and I made a fuss about it, and made sure he knew that I was making it just for him. A special little pillow, for naps away from home, made from things at home. He's napping at daycare, and hugging it too, so I think my plan worked - my plan to give him something special, from me to him, that is just his, but with a little of something of mine too.

Wednesday, 18 February 2015

On the needles: socks...


Just in time for the latest snow falls (3 times in 48 hours!!), I finished darning some holes in a pair of Michaels' woollen socks, and I finished making a pair of woollen socks for Jimmy. Michaels' socks will last a few more years, while Jimmy will outgrow his before May this year.

Darning Michaels' socks was made easier by using an old baseball inside the toe. It worked like a darning mushroom, only it didn't cost us anything as we have found a few baseballs while out and about. The work was quicker with the baseball in the toe and I'll use it again when I get around to darning a few more pairs of socks. While not the funnest of needlework projects, darning saves otherwise good socks from going to waste, and saves the replacement cost, which can be at least $15 per pair of knee-high woollen socks.


Jimmy's not-so-little socks were knitted using a Patons sock yarn, on 3 mm circular needles, based on the classic rib socks in Cute Knits for Baby Feet. I say "based on" because the pattern was a little unclear and odd in places, so I winged it when it came to the heel and then just checked the pattern to get an idea of how long to make the foot before starting the toe. Having knitted a few pairs of socks over the years, using really good patterns with really clear instructions, the socks turned out fairly well. They could be longer, but winter will be over soon and one way or another there will be no need for them.

This is what I did for a pair of socks that will fit a 12-18 month old who wears size 4-6 shoes:

  • Using sock yarn and 3 mm needles (circular or double pointed) cast on 36 stitches (I used the Old Norwegian cast on), join for working in the round, place stitch marker at the beginning of the round;
  • Start a 2x2 rib, work for 33 rounds;
  • Heel: knit 9 stitches, turn, slip first stitch, purl 17 stitches, turn, slip first stitch and begin working short rows until there are 6 stitches between the two sets of wrapped stitches, knit across the wrapped stitches (as for short rows) until there are no more wrapped or slipped stitches, ending with a knit row.
  • Foot: continue the 2x2 rib for 26 rounds*
  • Toe: knit 6 stitches, slip-slip-knit the next 2 stitches, knit 2, knit-together the next 2 stitches, knit 12, slip-slip-knit the next 2 stitches, knit 2, knit-together the next 2 stitches, knit 6, knit one round. Continue decreasing, alternating with knit round, until there are 16 stitches on the needles. Graft stitches and weave in ends.
  • Knit a second (or third or fourth sock).
Done!


*I would actually make the feet 28 rounds long, possibly 30, because Jimmy is wearing size 6 and size 6.5 shoes and the socks are a little short for his feet.

Friday, 10 October 2014

On the needles: mending

While finishing Jimmy's jumper, I relearned the joy of hand sewing. Yes, I enjoy a little hand sewing every now and then, and I decided to make a start on a pile of mending that I was accumulating. And while there are still items in need of repair, it is nice to know that items that are now too small for Jimmy are fixed and ready for another baby, and that when needed, Michael's light jumper is fixed.

Next on the list is sock darning... but Michael's vest first... oh and a beanie for my head, because it's going to get cold before we know it.

Thursday, 31 July 2014

On the needles: Striped Boatneck Sweater

I managed to finish this jumper for Jimmy, in time for his birthday!! It was fresh off the knitting needles 1 week before the big day, giving me a week to sew all the seams. Sewing seams is really satisfying. All it needs is to be blocked lightly and then we just have to wait until the seasons change, so that it's actually cool enough for Jimmy to wear it.

I'm really proud of how it's come out. The pattern is from a lovely book titled What To Knit When You're Expecting. I bought it in my 3rd trimester, which was a slight oversight on my part. Ah well... I cast-on the sleeping bag while in hospital but Jimmy grew very quickly, quicker than I could knit, so it's still unfinished...

Because of this, I was really worried that if I followed the pattern for the Striped Boatneck Sweater, it would be too small for Jimmy when it was needed, so I added a 2 stitches to every piece that was knitted. I had bought the yarn used in the book, it's lovely and light but it should be lovely and warm too, but I knit tightly so I had to check my gauge to see if I needed to go up 1 or 2 needle size. After checking my gauge, I went up 1 needle size, because the knitted swatch was too open, and then used instructions for the largest size. I figured that by going up 1 needle size and adding the extra stitches the sweater would be a little too large for a mid year winter but about the right size by New Years.

We were starting to pack up when I started the body of the sweater, and I finished the second body piece before leaving Australia. Once we were moved into our apartment I started on the sleeves and decided to knit both at the same time... It was slow going and some nights I didn't have the headspace for 4 balls of wool but it was worth it.


When it came to attaching the sleeves I couldn't use the measurements from the pattern, so I gently stretched out the sewn sleeves, measured the large opening, and pinned and sewed the side seams. Then I attached the sleeves. This seems to have worked and the sleeves sit well in the body.

While we're yet to see the sweater on Jimmy, it is nice and long, and roomy too. He's going to look so dapper!